Feirui EzDAQ / Equipment and test-bench integration
Equipment and test-bench integration
Connect sensors, instruments, PLCs and control equipment in one test process, linking operating conditions, measurement, control and records. Start with one device and extend to multi-parameter benches or central monitoring.

Application background
Test sites often use several instruments and controllers. Operators switch software, copy readings and collate results manually. Integration associates each reading with its test step, operating condition and conclusion.
Example applications
Instrument functional tests, heat-exchanger thermal tests, hydraulic test benches and factory measurement systems.
Technical and integration scope
- Create a device register covering interfaces, ranges, units and measurement points.
- Evaluate Modbus TCP, OPC / OPC UA, CAN, TCP / UDP and BACnet against the actual devices.
- Plan recipes, sequences, controlled conditions, trend records and reports.
Implementation workflow
- 01
Review equipment and protocols
- 02
Validate one device
- 03
Integrate measurement and control
- 04
Review test records and acceptance
Application value
Reduce repeated data entry, diagnose communication problems and make results comparable within a consistent test process.
Related experience
Discuss your project
Feirui · Shanghai · Remote delivery first
+86 181 2114 0720 ↗Start with your device list, available interfaces and acceptance criteria. On-site work is agreed separately for each project.
Prepare your project brief →Email: qia.sky@gmail.com · Reply by email with a short description of your project.
Planning your integration project
What can a test bench integration project include?
Review instrument interfaces, test sequences, operating conditions, pass/fail rules and result records. Control authority, safety interlocks and automation scope require project-specific agreement.
What should we prepare for a technical discussion?
List measurement parameters, instrument and fixture models, interfaces, sampling and cycle requirements. Describe a full test run and select one station with measurable acceptance criteria.
