Feirui EzDAQ / Automated testing and vision coordination
Automated testing and vision coordination
Connect instrument readings, motion, visual localisation and result evaluation around a station or experimental rig. Start by validating one station before expanding against cycle-time and decision rules.

Application background
A test station may combine a product, fixtures, signal acquisition, motion and result evaluation. Coordinating these steps and recording exceptions makes the station process repeatable.
Example applications
Functional tests for electronics, automotive components and appliances; visual localisation, three-axis motion and dispensing.
Technical and integration scope
- Review test signals, fixtures, instruments and motion devices.
- Convert visual positions to motion coordinates and coordinate the action sequence.
- Plan test steps, pass/fail rules, exception handling and product records.
Implementation workflow
- 01
Define station requirements
- 02
Validate signals and actions
- 03
Integrate vision and test sequences
- 04
Review cycle time and results
Application value
Help operators trace the measurements, movements and exceptions for each tested product.
Public references
Published engineering article: LabVIEW automatic dispensing (Chinese) ↗
Related experience
Discuss your project
Feirui · Shanghai · Remote delivery first
+86 181 2114 0720 ↗Start with your device list, available interfaces and acceptance criteria. On-site work is agreed separately for each project.
Prepare your project brief →Email: qia.sky@gmail.com · Reply by email with a short description of your project.
Planning your integration project
What can a test bench integration project include?
Review instrument interfaces, test sequences, operating conditions, pass/fail rules and result records. Control authority, safety interlocks and automation scope require project-specific agreement.
What should we prepare for a technical discussion?
List measurement parameters, instrument and fixture models, interfaces, sampling and cycle requirements. Describe a full test run and select one station with measurable acceptance criteria.
